Ship decisions, not just features
Every sprint contains three or four decisions that aren't written down anywhere. “We agreed to cut scope on search” — said in standup, forgotten by Thursday, rebuilt next sprint. Verdo makes the decision an artifact with an owner, a rule and an outcome.
What product teams actually decide
Not the roadmap. The dozens of smaller calls underneath it that nobody logs and everybody later disputes.
Ship or hold
The call that gets made in standup and forgotten by Thursday. Short deadline, majority rule, a named owner.
Scope in or out
The one most likely to be relitigated in the retro, and the one most worth a record of what the alternatives were.
Vendor and build-vs-buy
Expensive and hard to reverse. Three or four real contenders, a majority rule, and the owner on the record.
Hire or no-hire
Anonymous mode matters: seniority in the room skews an open vote. Consensus, so one strong objection blocks it.
Launch date
Everyone has an opinion and one person carries the consequence. Majority rule, and that person named as owner.
Feature prioritisation
Put the real candidates for the next slot side by side and pick one. The record keeps what was turned down for the next planning round.
Two rules, mapped to product reality
Pick the rule before anyone votes, so nobody argues afterwards about what the numbers meant.
Majority for the low-stakes
Which icon set, which copy variant, which of two equivalent libraries. Fast, and nobody needs to own the outcome.
Consensus for cross-functional
When engineering and design both have a veto in practice, make it explicit. If one side disagrees it does not pass — which is what would have happened anyway, two weeks later.
How it fits the sprint
- Raise it where it came upType /verdo in #product — or react ✅ to the message that started it and Verdo drafts the decision from it.
- Start from a template6 built in, including hire/no-hire, vendor selection, feature prioritisation and architecture decision. Save your own on Pro.
- Set the rule and the ownerBoth visible to everyone before a single vote is cast, which is the part that stops the result being reinterpreted afterwards.
- It closes itselfNon-voters get two DMs, the deadline fires, the rule is applied and the result posts to the channel.
- It reaches your trackerZapier or signed webhooks on Pro push a decided decision into Jira, Linear, Asana or a project channel.
- It gets reviewed30 days later the owner says whether it worked. That answer is on the record next to the decision.
The argument for an audit trail
“Why did we decide this?” is the most common question in a product retrospective and the hardest one to answer honestly.
Memory reconstructs decisions to make them look more deliberate than they were. A log that only records the outcome does the same thing. What makes the answer useful is the surrounding detail: what the alternatives were, who preferred which, which rule was applied, who owned it, and what the status is now — Decided, Implemented, Stalled, Superseded or Reversed.
Every mutating action writes an audit row, so the history cannot be quietly tidied up afterwards. Audit log export is planned for Business.
Frequently asked questions
How should a product team record decisions?
What is an audit trail on a decision?
Can decisions push to Jira or Linear?
What is the 30-day outcome review for?
Does Verdo replace an ADR?
What does it cost for a product team?
Keep reading
Async decisions for distributed teams
Deciding across four timezones without a meeting or a default winner.
How to stop decisions dying in Slack
The five elements a decision needs, and a 60-second framework for running one.
Verdo for Slack
Single-choice voting, a majority or consensus rule, and a decision that closes itself.
Verdo vs Polly
Surveys and feedback versus decisions with an owner and an outcome.
Add Verdo to your product workspace.
Put this sprint's ship/cut call through it and see what the record looks like at the end.
7-day free trial. Card required. Cancel anytime during the trial with no charge.